Design requirements for food plant construction drawings?

Author: Shenzhen Zhongjing Global Purification Technology Co., Ltd.issuing time:2018-07-23 20:35:02Pageviews:3292smallinBig

The construction drawing design of the food factory mainly transforms the design concept and design intention of the engineering and technical personnel into the engineering executable language, whi...

    The construction drawing design of the food factory mainly transforms the design concept and design intention of the engineering and technical personnel into the engineering executable language, which is embodied in the drawings, and then through manufacturing, construction and installation, the whole design project is changed from the idea to the reality; the construction drawing design It is a very specific, practical and meticulous design work that reflects design ideas in engineering language. It requires high-tech and technical personnel to have a high level of science and technology and rich practical experience; construction and installation are in accordance with the drawings. The construction drawing is of good quality, the construction will be smooth, and the production will be smooth. On the contrary, it will affect the progress of the whole project. The design basis of the food plant construction drawing is the approved preliminary design or technical design and approval opinions; the main equipment technical materials and product samples ordered by the construction unit; the agreement signed by the construction unit and each cooperation unit and each department; Technical data, product samples, national standard atlas, enterprise standard atlas of various regional departments, construction regulations and installation methods of construction and installation units.


    The design content and complexity of the construction drawings are also related to the technical level of the construction and installation units. For the construction and installation units with strong technical strength, rich experience and accumulated technical data, many common drawings can be simplified or omitted. Process part: including production flow chart, workshop process equipment layout plan, elevation plan, pipe layout plan, section or perspective view, equipment installation diagram, console, equipment and pipe supports, hangers, pipe parts, tools and equipment Table, material summary table, etc.; power part: including boiler room, air compressor station, freezer and cold storage equipment layout diagram, installation diagram, pipeline flow chart, pipeline insulation structure diagram, equipment room and plant pipeline layout diagram, main support, Hanging map and equipment table, material table, etc.; civil engineering part: including general layout plan, plant earth balance map, architectural plan of some buildings, elevation, structure and section, various node details, selection Standard maps, general maps, door and window diagrams, etc., building walls, roads, and channel structures. Zhongjing Global Purification can provide consulting services, consulting, design, construction and decoration services for food factories and food purification workshops.


    Food plant construction drawings for water supply and drainage: including water supply, drainage, water treatment, sewage treatment equipment layout, pipeline layout, plant drainage manhole, fire protection system, cooling tower and recycling water, wastewater recycling and equipment table, living room, sanitary equipment, bathroom Drainage pipe arrangement; heating and ventilation part, including ventilation, dust removal, heating, air conditioning equipment and piping layout, system diagram, pipeline installation and construction details, material list, general drawing and equipment table; instrument and automatic control part: including production process Flow, quality, liquid level, temperature, pressure of various media, indications of instruments, signals, schematic diagrams of adjustment systems, instrument panels, instrument cabinet layout diagrams, wiring diagrams and material tables, circuit diagrams; power supply: including Substation, high and low voltage power distribution room equipment layout, lighting wiring diagram, factory wiring system, lightning protection, communication, non-standard power distribution cabinet wiring diagram, installation details and equipment table, material table, lighting wiring diagram; construction instructions : The construction instructions including the various professional types of work are different, and the construction requirements of the process are required to install the equipment.

2018-07-23 3292People browsing
Undertake: sales and installation of purification equipment across the country

Get quotes quickly

*The quotation will be sent to your mobile phone as a text message or contact a professional technician to contact you.

主站蜘蛛池模板: 欧美一区二区三区在线视频观看 | 久久精品一本久久99精品 | 小sao货水好多真紧h无码视频 | 樱花草在线观看播放WWW | 黄色免费在线观看网站 | 在线成人看片黄A免费看 | 男人天堂免费视频 | 国产精品久久久久久久久久久久久久久 | 狠狠网站 | 热久久999| 披荆斩棘的哥哥第三季免费观看 | 一区二区三区日韩视频在线观看 | 亚洲国产成人AV片在线播放 | 亚洲欧洲精品一区二区三区波多野 | 国产三级精品最新在线 | 色婷婷久久久久swag精品 | 精品国产精品网麻豆系列 | 精品调教CHINESEGAY | 亚洲伊人久久大香线蕉结合 | 亚洲欧洲国产精品久久 | 精品国产VA久久久久久久冰 | 国内精品久久久久国产盗摄 | 欧美一区二区视频免费观看 | aaaaa爽爽爽久久久 | 91射网站 | 亚洲第一网站男人都知道 | 日本高清一区免费中文视频 | 国产精品三区四区 | ririai66在线视频观看 | 品久久久久久久久久96高清 | 一级毛片在线免费播放 | h视频在线免费看 | 浪潮色诱AV久久久久久久 | 国产ā片在线观看免费观看 | 伊人狠狠干| 成熟女人毛片www免费版在线 | 91免费在线?看网站 精品久久久久久中文字幕202 | 色资源AV中文无码先锋 | 日韩欧美激情兽交 | 99久久精品无码一区二区毛片免费 | 野花视频最新免费完整在线观看 |